Featured Projects

Water Treatment Facilities
  • El Feel Field Water Injection Project
  • Client: China Petroleum Pipeline Bureau
    Capacity: 180,000 BWPD (water treatment), 275,000 BWPD (water injection)
    Scope of Work: Detailed Design